Immission control; application for a permit for the construction and operation of a plant

The construction, operation and significant modification of certain industrial plants that may have a harmful impact on the environment require a permit under immission control legislation.

Description

Required documents

  • Application documents for immission control depending on the individual case

    cf. on the type of documents §§ 3 ff 9. BImSchV (see link "Legal basis")

Forms

Please select a location in "Localization" so that the address of the responsible authority can be filled in.

Fees

  • The costs incurred are set out in the schedule of costs under the Bavarian Costs Act, No. 8.II.0, tariff item 1.

Remedy

Administrative court proceedings; information

Administrative court action

Status:18.01.2024

Responsible for editing:Bayerisches Staatsministerium für Umwelt und Verbraucherschutz

Contains machine translated content. Show the original content

  • Online transactions, Bavaria-wide
  • Online transactions, locally limited
  • Form, Bavaria-wide
  • Form, locally limited
  • Prefillable Form, Bavaria-wide
  • Legal bases, Bavaria-wide
  • Legal bases, locally limited
  • Fees, Bavaria-wide
  • Fees, locally limited
Bild zur Leistungsbeschreibung

Responsible for you

If you select a location under "Localization" the contact details of the responsible authority and, if applicable, locally valid information will be displayed.