Immission control; application for a permit for the construction and operation of a plant

The construction and operation as well as the substantial modification of certain industrial plants, which may cause harmful effects on the environment, require a permit under immission control law.

Description

The types of installations concerned are listed exhaustively in the Ordinance on Installations Requiring a Permit (4th BImSchV).

The Federal Immission Control Act (BImSchG) stipulates that the erection and operation of installations that can typically cause harmful effects on the environment (cf. Section 4 (1) Sentence 1 BImSchG) require immission control approval. The types of installations concerned are listed exhaustively in the Ordinance on Installations Requiring a Permit (4th BImSchV).

A distinction is made between the formal procedure under Section 10 BImSchG and the simplified procedure under Section 19 BImSchG. Common to both procedures is that they require a written application and the submission of all documents relevant to the examination as well as the participation of other affected authorities. In the formal procedure, there is also a public announcement of the project, a public display of the application including documents and, if necessary, a hearing. In certain cases, an environmental impact assessment must also be carried out (cf. Ordinance on the Approval Procedure - 9th BImSchV).

As a rule, the district administrative authority (= district office or municipality) is responsible for the decision on the permit, in exceptional cases specified by law, the government (cf. Art. 1 Bavarian Immission Control Act - BayImSchG).
If the operator intends to change the location, condition or operation of an installation requiring a permit, he must also obtain a permit for this if it is a significant change (cf. § 16 Para. 1 BImSchG). Other changes must be notified to the licensing authority at least one month prior to commencement (Section 15 (1) BImSchG).

Required documents

  • Application documents for immission control depending on the individual case

    cf. on the type of documents §§ 3 ff 9. BImSchV (see link "Legal basis")

Forms

Please select a location in "Localization" so that the address of the responsible authority can be filled in.

Fees

  • The costs incurred are set out in the Schedule of Costs to the Bavarian Costs Act, No. 8.II.0, tariff item 1.

Remedy

Administrative court proceedings; information

administrative claim

Status:20.09.2023

Responsible for editing:Bayerisches Staatsministerium für Umwelt und Verbraucherschutz

Contains machine translated content. Show the original content

  • Online transactions, Bavaria-wide
  • Online transactions, locally limited
  • Form, Bavaria-wide
  • Form, locally limited
  • Prefillable Form, Bavaria-wide
  • Legal bases, Bavaria-wide
  • Legal bases, locally limited
  • Fees, Bavaria-wide
  • Fees, locally limited
Bild zur Leistungsbeschreibung

Responsible for you

If you select a location under "Localization" the contact details of the responsible authority and, if applicable, locally valid information will be displayed.