Combustion plants; display

If you operate a medium-sized combustion plant, gas turbine or internal combustion engine plant, you must notify the competent authority.

Description

Procedure

The notification must be submitted in writing by post or electronically to the competent authority.

Once the notification has been checked, it will be entered in a register of installations (this can also be found under the heading "Forms and information sheets"). The information contained in the register of installations is made publicly accessible in accordance with Section 36 of the 44th BImSchV and the provisions on access to environmental information (Environmental Information Act - UIG).

Deadlines

The notification must be submitted before commissioning a new system.

The operation of an existing installation must be notified by December 1, 2023.

Required documents

  • where applicable, a declaration signed by the operator stating that the combustion plant will not be in operation for more than the number of hours referred to above

  • where applicable, a declaration signed by the operator stating that the combustion plant will be operated only in case of emergency

Status:01.02.2024

Responsible for editing:Bayerisches Staatsministerium für Umwelt und Verbraucherschutz

Contains machine translated content. Show the original content

  • Online transactions, Bavaria-wide
  • Online transactions, locally limited
  • Form, Bavaria-wide
  • Form, locally limited
  • Prefillable Form, Bavaria-wide
  • Legal bases, Bavaria-wide
  • Legal bases, locally limited
  • Fees, Bavaria-wide
  • Fees, locally limited
Bild zur Leistungsbeschreibung

Responsible for you

If you select a location under "Localization" the contact details of the responsible authority and, if applicable, locally valid information will be displayed.