Heat pumps and geothermal probes; notification of boreholes for construction

Boreholes for the installation of geothermal probe systems and groundwater heat pumps must be notified to the responsible district administrative authority in order to protect the soil and groundwater against contamination.

Description

Deadlines

Work which penetrates so deeply into the ground that it may have a direct or indirect effect on the movement, level or quality of the groundwater shall be notified to the competent authority one month before commencement of the work.

If one month has elapsed since the notification and no cessation or removal order has been issued in accordance with Section 49 (3) WHG, the work may be commenced and carried out until the groundwater is affected.

Status:20.07.2023

Responsible for editing:Bayerisches Staatsministerium für Umwelt und Verbraucherschutz

Contains machine translated content. Show the original content

  • Online transactions, Bavaria-wide
  • Online transactions, locally limited
  • Form, Bavaria-wide
  • Form, locally limited
  • Prefillable Form, Bavaria-wide
  • Legal bases, Bavaria-wide
  • Legal bases, locally limited
  • Fees, Bavaria-wide
  • Fees, locally limited
Bild zur Leistungsbeschreibung

Responsible for you

If you select a location under "Localization" the contact details of the responsible authority and, if applicable, locally valid information will be displayed.