Road and subway railroads; application for the implementation of a planning approval procedure

Operating facilities for tramways may only be built if the plan has been approved in advance. When the plan is approved, the public and private interests affected by the project, including environmental compatibility, must be taken into account as part of the weighing process.

Description

Prerequisites

Construction or substantial modification of operating facilities for tramways.

Deadlines

As a rule, construction may not begin until a planning approval procedure has been carried out. Objections to the project can be submitted to the municipality or the government in writing or in writing up to two weeks after the expiry of the one-month period for the submission of objections. An action against a zoning decision must be brought within one month of notification.

Fees

  • As a rule, administrative costs are not incurred by objectors. Exceptions are expenses for requested copies, minutes, etc. Any expenses incurred by the objector (e.g. legal fees) must be borne by the objector.

Status:17.07.2023

Responsible for editing:Bayerisches Staatsministerium für Wohnen, Bau und Verkehr

Contains machine translated content. Show the original content

  • Online transactions, Bavaria-wide
  • Online transactions, locally limited
  • Form, Bavaria-wide
  • Form, locally limited
  • Prefillable Form, Bavaria-wide
  • Legal bases, Bavaria-wide
  • Legal bases, locally limited
  • Fees, Bavaria-wide
  • Fees, locally limited
Bild zur Leistungsbeschreibung

Responsible for you

If you select a location under "Localization" the contact details of the responsible authority and, if applicable, locally valid information will be displayed.