Timber construction funding program; application for funding for timber construction measures

The Free State of Bavaria promotes the amount of carbon dioxide sequestered for the new construction, extension and addition of storeys to multi-storey residential buildings and buildings for the purposes of local authorities in timber construction.

Description

Prerequisites

  • Buildings that meet at least the "Efficiency House Standard 55" energy standard are eligible for funding. The minimum energy standard for the newly constructed storeys or floors must be complied with in the case of "adding storeys" and "extension" measures.
  • Timber construction in the sense of the directive is the use of timber in essential construction elements of buildings. For this purpose, at least the building envelope (outer wall) must be realized in timber construction and two other essential components must be realized in timber construction, such as in particular: the wooden roof construction, ceiling constructions made of wood or wood composite structures, interior walls in timber construction, stairs (overall construction), balconies (overall construction).
  • Proof must be provided for the use of renewable, carbon-storing building materials. This is done using the "CO2-Tool" calculation tool, which is used to determine the amount of renewable raw materials used and the associated storage quantity ofCO2.
  • The eligible building materials must correspond to the current state of the art, be ready for the market and be suitable for the respective construction project and the construction method to be used. The use of raw materials from sustainable production or management is also a prerequisite.
  • Funding can only be provided for measures that have not yet been started.

Procedure

  • The application for funding must be submitted to the responsible district government using the currently valid application forms and the documents specified therein.
  • Approval is granted within the framework of the available budget funds according to the order in which applications are received. There is no legal entitlement to funding.
  • The responsible district government will arrange for the funds to be paid out and will check the proof of use.

Special notes

Amounts under EUR 25,000 per construction project are not funded (de minimis limit). The maximum total grant amounts to EUR 200,000 per construction project (maximum funding limit).

Deadlines

Proof that the funds have been used for the intended purpose must be provided in the form of a simple proof of use within three months of completion of the measure in accordance with model 4 of Art. 44 BayHO.

Required documents

  • Presentation of the overall concept

  • Construction documents

    Site plan (M 1:1.000), construction drawings (M 1:100), calculation of living space, calculation of enclosed space, cost calculation according to DIN 276

  • CO2-Tool_Wood 1.0 - Proof of origin of renewable raw materials from sustainable forest management

  • Proof of integrated planning approach for the construction project

  • Proof of the origin of renewable raw materials from sustainable forest management

  • De minimis aid declaration

Forms

  • Form, Bavaria-wide: Antrag: Förderung von langfristig gebundenem Kohlenstoff in Gebäuden in Holzbauweise in Bayern
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Form, Bavaria-wide: Anlage 1: CO2-Tool_Wood 1.0
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Form, Bavaria-wide: Anlage 2: Nachweis Integrierter Planungsansatz für das Bauvorhaben
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Form, Bavaria-wide: Anlage 3: Nachweis der Herkunft nachwachsender Rohstoffe aus nachhaltiger Forstwirtschaft
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Form, Bavaria-wide: Anlage 4: De-minimis-Beihilfe Erklärung
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

Fees

  • The application and approval process is free of charge.

Remedy

Administrative court proceedings; information

Administrative court action

Status:21.12.2023

Responsible for editing:Bayerisches Staatsministerium für Wohnen, Bau und Verkehr

Contains machine translated content. Show the original content

  • Online transactions, Bavaria-wide
  • Online transactions, locally limited
  • Form, Bavaria-wide
  • Form, locally limited
  • Prefillable Form, Bavaria-wide
  • Legal bases, Bavaria-wide
  • Legal bases, locally limited
  • Fees, Bavaria-wide
  • Fees, locally limited