Floods; preparation of a community notification plan

The municipalities participating in the flood information service draw up reporting plans, which measures have to be carried out by which agencies at which water levels. A notification plan provides information on responsible agencies or self-help options.

Description

The measures to be initiated (depending on the water level) are described in the municipal notification plan, the responsibilities and information channels are regulated, the contact data of all affected agencies and lists of available material and equipment are included.

In order to guarantee a smooth flood operation, the municipal notification plan is constantly updated. Experiences from past floods are processed and structural conditions are taken into account. Support from relief organisations is also taken into account.

Links to more information

Status: 01.08.2021

Responsible for editing: Bayerisches Staatsministerium für Umwelt und Verbraucherschutz

Contains machine translated content. Show the original content

  • Online transactions, Bavaria-wide
  • Online transactions, locally limited
  • Prefillable Form, Bavaria-wide
  • Legal bases, Bavaria-wide
  • Legal bases, locally limited
  • Fees, Bavaria-wide
  • Fees, locally limited
Bild zur Leistungsbeschreibung

Responsible for you

If you select a location under "Localization" the contact details of the responsible authority and, if applicable, locally valid information will be displayed.