Drinking water and wastewater facility; application for hardship funding.
The Free State of Bavaria supports Bavarian cities and municipalities with grants for the rehabilitation of drinking water and wastewater facilities in cases of hardship.
Description
Purpose
In cases of hardship, projects for the rehabilitation of existing public water supply and wastewater disposal facilities are funded if they lead to unreasonable burdens on local authorities and citizens.
Object
In cases of hardship, the following are subsidized
- the structural rehabilitation of existing drinking water pipes and sewers (No. 2.2.1 RZWas 2021) and
- the initial construction of interconnecting pipelines for water supply facilities as well as the initial construction of interconnecting sewers when sewage treatment plants are abandoned (No. 2.2.2 RZWas 2021),
- the structural rehabilitation of existing drinking water extraction and treatment plants, drinking water reservoirs, sewage treatment plants, pumping stations and stormwater tanks (No. 2.2.3 RZWas 2021),
- the accession of the facility operator to a special-purpose association (No. 2.2.4 RZWas 2021), and
- the preparation of rehabilitation and structural concepts (No. 2.2.5 RZWas 2021).
Beneficiaries
Funding is available for municipalities with up to 20,000 inhabitants, their own undertakings, special-purpose associations and municipal undertakings that levy contributions and/or charges or water prices; undertakings undergoing private-law reform and water and soil associations, provided that a regional authority has a 100% shareholding.
Eligible costs
Hardship funding is provided for projects under Nos. 2.2.1 and 2.2.2 RZWas 2021 on a length-dependent basis with fixed funding lump sums. In the case of projects under Nos. 2.2.3, 2.2.4 and 2.2.5, the flat rates are calculated on the basis of population figures. The eligible costs are determined by the expenses carried forward in the construction expenditure book after execution of the measure less the non-eligible expenses pursuant to No. 5.3 RZWas 2021.
Type and amount
The grants are awarded on a project-related basis by way of partial financing as allocations. Hardship funding is provided with fixed funding lump sums (net):
- 120 euros per meter of water pipeline rehabilitated,
- 80 euros per meter of interconnected pipeline built for the first time (no minimum subsidy),
- 150 euros per renovated meter of sewer,
- 300 euros per meter of sewer renewed, and
- 125 euros per meter of interconnected sewer built for the first time (no minimum subsidy),
The subsidy is set at a minimum of 40% and a maximum of 90% of the eligible construction costs. Once hardship threshold 2 is reached, the flat-rate subsidies increase to:
- 180 euros per renovated meter of water pipe,
- 225 euros per meter of sewer renovated,
- 450 euros per renewed meter of sewer,
Once hardship threshold 2 is reached, the subsidy is set at a minimum of 70% and a maximum of 90% of the eligible implementation costs. In addition, there are the following flat-rate subsidies:
- 250 euros per connected inhabitant for plant rehabilitation in accordance with No. 5.4.3, up to a maximum of 70 % of the eligible implementation costs,
- 40 euros per resident taken in by a special-purpose association in accordance with No. 5.4.4, up to a maximum of 100,000 euros, and
- 20 euros per connected inhabitant for redevelopment and structural concepts according to No. 5.4.5 RZWas 2021, a maximum of 70 % of the eligible implementation costs and a maximum of 50,000 euros.
Prerequisites
- Interconnected pipelines and sewers according to No. 2.2.2 RZWas 2021, as well as rehabilitation and structural concepts according to No. 2.2.5 RZWas 2021 are funded regardless of whether a hardship threshold is reached.
- For projects under Nos. 2.2.1, 2.2.3 and 2.2.4, funding will be granted if the per capita burden determined in accordance with Annex 2 RZWas 2021 exceeds one of the hardship thresholds under No. 4.3 RZWas 2021.
- Funding can only be provided for projects that have been started since the grant notice was issued (= first award of contract). Projects according to No. 2.2.2 and 2.2.3 RZWas 2021 can only be started after the planning has been inspected and approved by the local water management office.
- The local water management office will provide advice on the details.
Procedure
- The application for funding must be submitted to the local water management office.
- After successful examination, the application is included in the hardship program. The Water Management Office issues the notification of funding.
- Subsidies can be called up a maximum of once a year after submission of a confirmation of use to the Water Management Office.
- The local water management office will provide advice on the details.
Deadlines
The guidelines for grants for water management projects (RZWas 2021) are limited until December 31, 2024.
Required documents
-
Explanation (summary for the part to be funded in the construction phase) (2-fold)
-
Site plan in which the parts to be conveyed are marked in red (2-fold)
-
Decision of the responsible body of the beneficiary to carry out the project (2 copies)
-
Form according to Annex 2 RZWas 2021 (Determination of the per capita load) (2-fold)
-
For projects pursuant to Nos. 2.2.1, 2.2.3 and 2.2.4 RZWas 2021: Form pursuant to Annex 2 RZWas 2021 (determination of per capita load) (2 copies)
-
Declaration by the project-executing agency as to whether it will pass on the grant to third parties (2 copies)
-
Declaration by the project executing agency as to whether it or the final recipient is entitled to deduct input tax (2 copies)
Links to more information
Status: 14.12.2022
Responsible for editing: Bayerisches Staatsministerium für Umwelt und Verbraucherschutz
- Online transactions, Bavaria-wide
- Online transactions, locally limited
- Prefillable Form, Bavaria-wide
- Legal bases, Bavaria-wide
- Legal bases, locally limited
- Fees, Bavaria-wide
- Fees, locally limited