Municipal road and bridge construction projects; application for funding under the Municipal Special Construction Burden Program.

The Free State of Bavaria grants subsidies for construction measures on state roads, as well as for the construction of independent cycle paths and for measures to improve accessibility and access from individual to public transport.

Description

The following can be funded from the Bavarian Fiscal Equalization Act (Art. 13f BayFAG)

  • Construction of bypasses or relief roads in the course of state roads that are the special responsibility of municipalities,
  • Modification of existing intersections of state roads with county and/or municipal roads, provided that the municipalities and counties concerned bear the modification costs,
  • Construction of dependent (sidewalks and) cycle paths on state roads, insofar as the municipality assumes the costs,
    Construction or expansion of cycle paths and other sidewalks and cycle paths within the meaning of Art. 53 No. 2 of the Bavarian Roads and Paths Act as well as the expansion of public field and forest paths within the meaning of Art. 53 No. 1 of the Bavarian Roads and Paths Act, which are of traffic significance for supra-local cycle traffic and for which the municipalities bear the construction obligation or the districts bear the special construction obligation,
  • construction measures by municipalities and administrative districts to create barrier-free access and improve access in the transition area from individual to public traffic,
  • Planning with regard to measures to create barrier-free access at railroad stations.

Recipients of grants

Municipalities and counties can receive grants for the individual funding measures in accordance with the allocations in the description.

Eligible costs

Reference is made to No. 6 of the Guidelines for Grants from the Free State of Bavaria for Road and Bridge Construction Projects of Municipal Building Authorities (RZStra).

Type and amount

Funding is granted on a pro-rata or fixed-amount basis in relation to the eligible costs. The amount of funding is determined in accordance with No. 7 of the RZStra.

Prerequisites

  • The remaining financing of the project or a construction phase with its own traffic significance must be guaranteed.
  • The type and scope of the project must be urgently required to improve traffic conditions.
  • The project must be flawless in terms of construction and traffic engineering, protect the natural balance, the landscape and land as far as possible and be planned taking into account the principle of economic efficiency and economy.
  • The needs of people with disabilities or mobility impairments must be taken into account.
  • Funding in accordance with Art. 13f BayFAG is only possible if the eligible costs exceed the de minimis limit of 50,000 euros.
  • The funding quota for new projects to be included in the program is limited. If the demand for funding exceeds the available expenditure funds, the other funding items are given priority over measures to improve accessibility and access routes and over planning with regard to measures to achieve accessibility at railroad stations.
  • Projects on state roads must be coordinated with the responsible state building authority at an early stage.

Procedure

The funding application must be submitted to the responsible district government.

Deadlines

The project must not have been started yet.

Please note that there is a deadline for submitting applications for grants from funds under Art. 13f BayFAG. Applications must be submitted by September 1 of the year preceding the start of funding at the latest.

Required documents

  • Application form (model 1 a to Art. 44 BayHO)
  • a design drawn up in accordance with the guidelines for design in road construction (RE)
  • Determination of eligible costs (Model 1 of RZStra)
  • Information on the financial situation (model 2a or 2b to Art. 44 BayHO)
  • Verifiable calculation or/and explanation of third party cost sharing
  • Special construction load agreement
  • Proof of compliance with the legal requirements

Forms

Please select a location in "Localization" so that the address of the responsible authority can be filled in.

  • Prefillable Form, Bavaria-wide: Antrag auf Gewährung einer Zuwendung (Muster 1a zu Art. 44 BayHO)
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Prefillable Form, Bavaria-wide: Antrag auf Bewilligung weiterer Zuwendungsraten (Muster 1b zu Art. 44 BayHO)
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Prefillable Form, Bavaria-wide: Angaben zu den finanziellen Verhältnissen (Muster 2a zu Art. 44 BayHO - Kameralistik)
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Prefillable Form, Bavaria-wide: Angaben zu den finanziellen Verhältnissen (Muster 2b zu Art. 44 BayHO - Doppik)
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Prefillable Form, Bavaria-wide: Auszahlungsantrag (Muster 3 zu Art. 44 BayHO)
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Prefillable Form, Bavaria-wide: Verwendungsnachweis (Muster 4 zu Art. 44 BayHO)
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Prefillable Form, Bavaria-wide: Verwendungsbestätigung (Muster 4a zu Art. 44 BayHO)
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Prefillable Form, Bavaria-wide: Anlage 3: Ermittlung der zuwendungsfähigen Kosten (Muster 1) zu den Nrn. 11.1.2 und 11.3 RZStra
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

  • Prefillable Form, Bavaria-wide: Mitteilung gem. Nr. 1.1 NBest-Bau – Zuwendungen/Zuweisungen nach BayFAG und BayGVFG
    Please note

    This form has to be signed and sent to the responsible authority. You can sign the form manually and send it by email/fax or sign the form electronically with your qualified electronic signature an send it by (secure) email. If the responsible authority has set up a De-Mail account, you can also send the form by De-Mail using an sender-confirmed message.

Status: 28.04.2023

Responsible for editing: Bayerisches Staatsministerium für Wohnen, Bau und Verkehr

Contains machine translated content. Show the original content

  • Online transactions, Bavaria-wide
  • Online transactions, locally limited
  • Prefillable Form, Bavaria-wide
  • Legal bases, Bavaria-wide
  • Legal bases, locally limited
  • Fees, Bavaria-wide
  • Fees, locally limited
Bild zur Leistungsbeschreibung

Responsible for you

If you select a location under "Localization" the contact details of the responsible authority and, if applicable, locally valid information will be displayed.